Roles and Responsibilities Scoping – Through the engineering and design planning, the construction roles and responsibilities can start being defined. This can also help determine spacing for furniture, industrial equipment, special needs accessibility, etc. Initial designs can be presented to the client and provide a representation of how the final building will look and feel. Initial Design Development – After identifying engineering issues and infrastructure, designs can be started. Understanding these can be a solid first step to the construction needs and guidelines.
This includes examining plumbing, electrical and HVAC systems to determine their current state and if updates need to be made in the construction process. Here are important elements of the pre-construction checklist:Įngineering Assessment – Prior to other steps in the building process, assessments must be made of existing conditions of the building space. Basically, there is a checklist of what will be done, prior to ground-breaking, to help analyze, plan and fulfill the needs for the building project.
Before beginning a building project, pre-construction planning needs to take place.